Lavador de gases linea de niquel brillante

Gas Scrubber

Full design and implementation

Corrosion Resistant Gas Scrubber Systems

We design extraction systems for gas scrubbing based on the “American Conference of Governmental Industrial Ðygienists” in the Industrial Ventilation Manual. Under these principles and experience we can provide appropriate solutions to control emissions into the environment and comply with government regulations.

This, together with the selection of materials, our specialized equipment for rolling and cutting material and our human capital, we can offer gas washing systems, manufacturing of ducts and extraction hoods according to their needs.

In addition to this we can offer the installation and commissioning of the systems, and even integrate them with your current automated systems.

Do not hesitate to contact us, we can gladly find the best solution for your needs

Lavador de gases con etapa de carbon activado

Steps 

Experience Makes the Difference

01

Initial Technical Assessment

Our designs comply with applicable regulations in each country and incorporate physicochemical and mass transfer modeling based on the specific contaminants to be captured. This ensures the required removal efficiency and delivers a truly effective and sustainable process.

02

Engineering Design

Todos los componentes se modelan en SolidWorks por nuestros expertos en diseño por lo cual la fabricación e instalación se realiza con facilidad y planeación de inicio a fin. Además todos los equipos integrados son simulados para un funcionamiento perfecto a través del tiempo. Esto siempre considerando los espacios del cliente para la instalación, con esto optimizamos espacios al máximo.

03

Equipment Manufacturing

Our highly trained manufacturing team conducts a thorough evaluation of the materials used in fabrication, considering chemical compatibility, environmental exposure, altitude above sea level, average annual rainfall, and maximum allowable ambient noise levels. We are certified to world‑class standards in plastic thermofusion and metal welding.

04

Installation and Start‑Up

Installation is carried out according to a plan agreed upon between the client and LP. Based on our 10 years of experience, this plan is typically completed in a shorter timeframe and without incidents. Our team includes experts in working at heights, on‑site plastic thermofusion, and the integration of electrical and electronic equipment.

During commissioning, 24‑hour performance tests are conducted to ensure that all equipment operates according to specifications. Finally, the equipment is handed over to the client, and personnel training is provided.